RIL's KG D6 output again drops

After two months of increase, natural gas production from Reliance Industries' eastern offshore KG-D6

RELATED ARTICLES

block has again started to drop.

Output, which had risen to 13.63 million standard cubic meters per day in February, has dropped to 13.28 mmscmd this month, the Directorate General of Hydrocarbon (DGH) said in a production status report to the Oil Ministry.

RIL produced a total of 13.58 mmscmd of gas from Dhirubhai-1 and 3 gas fields and MA oil and gas field in the KG-DWN-98/3 or KG-D6 block in Bay of Bengal in the first week of February, which rose to 13.63 mmscmd in the following week.

However, output has since dropped to 13.28 mmscmd in the week ending March 9, it said.

This output is made up of 8.17 mmscmd from D1&D3 and 5.11 mmscmd from MA field.

RIL had in January began production from the MA-8 well on the MA oil and gas field to help reverse the declining trend in output from the KG-D6 block. The well added over 1.5 mmscmd to the output to take MA production to 5.33 mmscmd last month.

Production at KG-D6 had last month dropped to just about 11.7 mmscmd and MA-8 has helped reverse the falling trend of the past three years.

RIL, which is the operator of the block with 60 per cent interest, has so far drilled 22 wells on D1&D3 fields but has put only 18 on production so far. During the week under review, "total 8 wells were on production and 10 wells were kept closed", the DGH report said.

BP of UK has 30 per cent stake while Canada's Niko Resources the remaining 10 per cent.

Out of 7 wells on MA field, 5 wells are on production. "One well, named MA-6H is under work-over (repair) since January 16, 2014. Another well namely, MA-7H is kept under shut-in," it said.

Of the 13.28 mmscmd of cumulative production, 12.58 mmscmd was sold to fertiliser plants and the remaining 0.7 mmscmd gas was consumed by the East-West pipeline which transports the fuel from east coast to the west, the report said.

The KG-D6 fields, which began gas production in April 2009, hit a peak output of 69.43 mmscmd in March 2010 before water and sand ingress shut down well after well.

D1&D3, the largest of the 18 gas discoveries in the KG-D6 block, produced 66.35 mmscmd, while 3.07 mmscmd was the output from the MA field, the only oil discovery on the block.

Besides the fall in output from D1&D3, gas production from the MA field, which had hit a peak of 6.78 mmscmd in January 2012, has dropped.

The company has so far made 19 gas and one oil discovery in the Krishna Godavari basin block in the Bay of Bengal. While the lone oil find, MA went on stream in September 2008, D1 & D3 were put into production in April 2009.

Post new comment

E-mail ID will not be published
CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.

EDITORIAL OF THE DAY

  • Child abuse needs to be tackled with the seriousness it deserves

    The Bangalore rape case has again brought into focus an issue we Indians forever shy away from facing up to — child sexual abuse.

FC NEWSLETTER

Stay informed on our latest news!

INTERVIEWS

GV Nageswara Rao

MD & CEO, IDBI Federal Life

Timothy Moe

Goldman Sachs

Chander Mohan Sethi

CMD, Reckitt Benckiser India

COLUMNIST

Varun Dutt

<b>Riskfactor</b>: THE BASE RATE BIAS

Base rate fallacy, also called base rate neglect or base ...

Parvez Imam

Revisiting history can do us all good

We often think that we understand history. We read it ...

Bubbles Sabharwal

Your happiness doesn’t depend on your needs

They are two different words (and even worlds) altogether: having ...

INTERVIEWS

William D. Green

Chairman & CEO, Accenture